BEWARE OF FAKE INSTITUTES WITH SIMILAR NAMES. blank    blank
banner

Omkareshwar Dam Solar Park: Renewable Energy Advancement



  Mar 28, 2024

Omkareshwar Dam Solar Park: A Leap Towards Renewable Energy



The Omkareshwar Dam Solar Park is poised to become a cornerstone in India’s renewable energy landscape. Located over the Narmada River in Madhya Pradesh’s Khandwa district, this ambitious project is set to light up approximately 9 lakh homes, making it a significant step towards sustainable energy.

Highlights of the Omkareshwar Dam Solar Park:

• Capacity and Impact: Upon completion, the solar park will produce 600 megawatts of power, enough to illuminate over 90,000 homes or the equivalent of the entire city of Indore during the daytime. This vast project spans 6.6 square kilometers of water surface, showcasing the scale and ambition behind India’s push towards renewable energy sources.

• Investment and Phases: With an estimated cost of Rs 3,950 crore, the first phase of the project aims to generate 340 megawatts of solar power. The urgency of the timeline is underscored by the goal to have the first phase operational by April 1, aligning with strategic periods such as the Lok Sabha elections.

• Environmental and Operational Benefits: Floating solar plants, like the one at Omkareshwar Dam, offer numerous advantages. They significantly reduce land usage, minimize water evaporation, and maintain cooler operating temperatures for the solar panels. This innovative approach not only conserves valuable terrestrial ecosystems but also enhances the efficiency of solar energy generation.

• Global Positioning and Local Impact: The project not only aims to secure Madhya Pradesh’s spot on the global solar energy map but also to transform Omkareshwar into a renewable energy hub. The emergence of factories manufacturing floaters for the panels in nearby Indore exemplifies the project’s local economic impact.

• Contribution to National Goals: India’s commitment to achieving a renewable energy target of 500 GW installed capacity by 2030 is significantly bolstered by the Omkareshwar Dam Solar Park. This initiative is crucial in shifting the balance from fossil fuel-based power generation towards cleaner, sustainable sources.

Concerns and Future Outlook:

While the project has generated enthusiasm among scientists, engineers, and renewable energy advocates, ecologists have raised concerns about potential impacts on marine life and water quality due to reduced sunlight penetration. Ongoing studies and lab setups aim to monitor these effects closely, ensuring the project’s sustainability.

Floating solar photovoltaic technology, first commercialized in California in 2008 and developed in Japan, is now becoming increasingly popular in Asia. Countries where land is a premium resource have seen the value in utilizing water bodies for solar energy generation. The Omkareshwar project, therefore, is not just a national achievement but a part of a growing global trend towards innovative renewable energy solutions.

SRIRAM’s


Share:
 

Get a call back

Fill the below form to get free counselling for UPSC Civil Services exam preparation

 
UPSC DAILY CURRENT AFFAIRS

 
KANCHANA CHITRA RAMAYANA
 
ALGAE-BACTERIUM SYMBIOSIS
 
REITs and SM REITs: Exploring Real Estate Investments
 
Marine Protected Areas (MPAs)
 
Bioluminescence in the Western Ghats: Mycena Bacteria
 
Ocean Heat Absorption and Its Impact on Climate Change
 
SAF Development and ASTM D1655 Standards in India
 
World Bank Shareholding and Voting Power
 
Debt-for-Climate and Nature Swaps
 
Cluster-Based Business Orgs in India's FPO Scheme
 
India’s ROCKS missile
 
INDIA'S FIRST COMPREHENSIVE WATER BODIES CENSUS
 
Inheritance tax in India
 
WHO GUIDELINES ON NON-SUGAR SWEETENERS (NSS)
 
INDIA'S EXPERIMENTAL HEAT INDEX